Hilton Hotel Batumi
Client:
Anagi GE, MACE GroupServices provided:
Construction, DevelopmentSectors:
HotelsLocation:
Batumi, GeorgiaYear:
Jan 2013, Jan 2015Status:
DeliveredAwards:
World Travel Awards 2021 WinnerD3 Construction Company carried out the foundationfoundation developmentdevelopment and construction of thethe monolithicmonolithic reinforcedreinforced concreteconcrete structuresstructures of the building, mixed with steel and finishing the façade, delivering a unique and excellent outcome for our client.
Located right on the Batumi Seaside Boulevard on the black sea coast, Hilton A 75,000 m2 mixed-used development comprised of two towers; a 21-storey hotel tower for Hilton International and a 19-storey residential tower; built over a double basement.
To meet the client’s aspiration for a tower building with basement in a seismic zone, D3 were able to deliver the foundation development and construction of the monolithic reinforced concrete structures of the building, mixed with steel and finishing the façade, delivering a unique and excellent outcome for our client.
"Every project, either large or small, aims at the absolute satisfaction of the individual and his everyday needs and requirements through qualitative, resilient to time constructions that respect the environment.”
CEO, D3 Constructions - Sysylas Dimitrios
"We offer constructions at the best possible design solutions combined with excellent quality materials and the most modem construction techniques, thus creating an outstanding aesthetic result."
CEO, D3 Constructions - Sysylas Dimitrios
The building mixes steel and concrete construction to efficiently frame out ballrooms and roof top bars whilst taking account of the seismic nature of the region.
Building Surface
Reinforced Concrete
Number of Storeys
Parking Lots